The Building Safety Regulator (BSR) has new numbers. The data is from October 1, 2025. It shows how higher-risk buildings (HRBs) are moving through the key Gateway 2 stage. In fact, these figures confirm the huge amount of work facing the BSR. Yet, they also show a new, big plan to clear the long wait. In the end, this will build lasting capacity.
So, this report is key for all professionals. After all, it gives a clear look at where projects stand. Furthermore, it shows where future jobs and resources will go.

The Gateway 2 Workload: An October Snapshot
The data confirms the industry is shifting. That is to say, it is moving away from the old system and into the BSR’s new process. The BSR focuses on two main areas: new construction and fixing old buildings (remediation).
The work is very large:
- New Build Applications: 152 applications, covering 33,670 homes.
- Remediation Applications: 253 applications, covering 22,304 homes.
Thus, there are 253 remediation cases. Consequently, this big number shows the clear need for Building Safety Managers and Registered Building Inspectors (RBIs). Specifically, they must be skilled in fixing existing structures. This demand directly addresses the BSR Gateway 2 Jobs Demand.

Strategy Shift: The September 2025 Batching Process
The BSR had to fight the huge workload. Therefore, it launched a new batching process in September 2025. This plan helps increase capacity. Crucially, it does not risk the quality of decisions made by the Innovation Unit (IU).
The Main Goal: To quickly fix the backlog in both new and old building applications. In short, this will create lasting future capacity. This action drives the BSR Gateway 2 Jobs Demand.
The BSR bundles applications. Then, it sends these mixed cases to outside suppliers.
- Batch 1 Launch: The first batch (26 cases) went out on September 30, 2025.
- Batch 1 Content: This first group included 10 high-priority remediation cases. In addition, it included 16 refurbishment cases. These needed input from a structural engineer only.
The BSR plans weekly dispatches of new bundles. Naturally, this depends on how much work suppliers can handle. For this reason, this strategy creates a fast need for RBIs and mixed teams. They must quickly process these batched applications.

What This Means for Building Safety Jobs
This data points to two key areas for job growth:
- Remediation Experts: 253 applications are waiting. As a result, the demand is high for engineers and consultants. They must produce high-quality compliance statements.
- External Capacity: The BSR now uses the new batching process often. Thus, this means more work is going to external contractors. Consequently, jobs for RBIs and structural engineers will increase fast. This will happen as suppliers win these BSR contracts. This increase confirms the strong BSR Gateway 2 Jobs Demand.
The new batching system is a clear sign. So, the industry must now grow fast to match the BSR’s speed.